Pricing
Straightforward pricing
Prices start from the amounts below and depend on lot size and complexity. Your exact quote appears after you enter the address.
| Survey | Starting at | What it covers |
|---|---|---|
| ALTA/NSPS land title survey | $2,500 | Commercial transactions. Quoted after review.Typical turnaround: 21 business days |
| FEMA elevation certificate | $400 | Flood insurance rating and LOMA applications.Typical turnaround: 5 business days |
| Residential boundary survey | $450 | Boundary lines, corners marked, improvements shown. Most residential lots.Typical turnaround: 7 business days |
| Title survey (Category 1A) | $550 | For closings: boundary, improvements, easements of record, T-47 compatible.Typical turnaround: 7 business days |
| Topographic survey | $1,200 | Contours and features for design. Quoted after review.Typical turnaround: 10 business days |
| Construction staking | $165 per crew hour | We mark building corners, offsets or grades on site from the approved plans, so the builder puts the work in the right place.Typical turnaround: 5 business days |
| Subdivision or replat | Quoted after review | A new plat to divide, combine or change lots, prepared for the city or county approval. Priced after we review the property and the rules that apply.Typical turnaround: 45 business days |
| Lot split | $1,800–$3,500 | Divides one tract into two or more, with the new descriptions and drawing. The price depends on the size and the county or city rules.Typical turnaround: 21 business days |
| Update of our earlier survey | $350 | We surveyed this property before: we check it again in the field and re-issue the survey with today's date, for less than a new survey.Typical turnaround: 5 business days |
| Final survey (new home) | $450 | The survey of a finished new home for the closing, showing the house, flatwork and fences on the lot.Typical turnaround: 5 business days |
| Easement or tract description (field notes) | $650 | A written legal description and drawing of an easement or part of a tract, ready to attach to a deed or easement document.Typical turnaround: 10 business days |
| Alcohol permit distance survey (TABC) | $500 | Measures the distance from your business to nearby schools, churches and hospitals as the Texas Alcoholic Beverage Commission requires.Typical turnaround: 7 business days |
| Elevation certificate with the survey | +$150 | FEMA form showing the building's elevation against the flood level. Lenders and flood insurers ask for it in flood zones; it costs less with the survey. |
|---|---|---|
| Help with a LOMA (flood zone removal) | +$450 | If your house sits above the flood level, a FEMA Letter of Map Amendment can remove the flood insurance requirement. We prepare and file the application. |
| Set corner markers | +$100 | Sets new iron rods where property corners are missing, so you can see your lines on the ground. |
| Stake a fence line | +$125 per line | We put stakes along each property line you choose, so the fence goes in on your side of the line. |
| Tree survey | +$200 | Locates and labels protected trees (species and trunk size) for city permits and site plans. |
| Topographic detail on the lot | +$250 | Adds ground elevations and contours to the survey, for drainage, pools, additions and permits. |
| Review of an existing survey and T-47 | +$150 | If the seller already has a survey and a T-47 affidavit, we check whether it still matches the property, which may save the cost of a new survey. |
| Extra certification party | +$50 per party | Adds another company or person (a second lender, a buyer's company) to the surveyor's certification on the drawing. |
| Digital drawing file (CAD) | +$75 | The survey drawing as a CAD file (DWG or LandXML) for your architect, engineer or builder. |
Prices depend on lot size and complexity; the exact figure for your property appears after you enter the address. Larger or irregular parcels get a reviewed quote within one business day.
Price my property